ArchCiv Logo
  • 01 /Home
  • 02 /About
  • 03 /Services
  • 04 /Projects
  • 05 /Compliance
    Financial ReportsPublic NoticesDisclosuresTender Registry
Get in Touch
// MOBILE NAVIGATION PROTOCOL
  • 01HomeSELECTED
  • 02About→
  • 03Services→
  • 04Projects→
  • 05Compliance↓
    • Financial Reports→
    • Public Notices→
    • Disclosures→
    • Tender Registry→
Get in Touch
// WHATSAPP SECURE LINE
Upper Tamakoshi Hydropower Phase II
View Fullscreen
// FEATURED MASTER REGISTRY // HYD-01

Upper Tamakoshi Hydropower Phase II

Operating in one of the most geologically volatile zones on earth, our engineering team delivered a comprehensive structural overhaul of the primary surge shaft and subterranean adit tunnels. The project demanded zero-tolerance precision amidst extreme weather windows, shifting fault lines, and complex logistical constraints, ultimately setting a new benchmark for high-altitude resilient engineering.

4,500M ASL
// ELEV_AXISELEVATION
22 MO.
// TIME_LOGDURATION
4.2B NPR
// CAPITAL_VALVALUE (NPR)
INDEX_2026
// ACTIVE FILTER REGISTRY SYSTEM
✕ All Projects
[ ] Hydropower
[ ] Roads & Transit
[ ] Structural
[ ] Municipal
[ ] Environmental
// PROJECT_REG_01
(+)DISTRICT // DOLAKHA DISTRICT // HIGH-ALTITUDE CORRIDOR
27.8722° N // 86.2140° E
Upper Tamakoshi Hydropower Phase II
[ HYD-01 ]

Upper Tamakoshi Hydropower Phase II

Executing end-to-end operational stress limits logging, dynamic seismic structural load test analysis, and high-velocity geomorphic barrier stability auditing for critical run-of-river concrete structures under extreme tectonic pressure.

View Structural Manifest
// PROJECT_REG_02
(+)DISTRICT // KATHMANDU BASIN
27.7172, 85.3240
Kathmandu Ring Road Expansion Node
[ URB-04 ]

Kathmandu Ring Road Expansion Node

Advanced grade-separated interchange engineering, micro-simulation traffic tracing, and sustainable subterranean drainage framework deployments.

View Structural Manifest
// PROJECT_REG_03
(+)DISTRICT // KARNALI PROVINCE
28.6384° N // 81.2811° E
Karnali Bridge Structural Audit
[ STR-09 ]

Karnali Bridge Structural Audit

Executing detailed dynamic load profiling and corrosion progression mapping on one of the country's most critical transit spans.

View Structural Manifest