// SEC. 01: PROJECT SALIENT FEATURES

The Project, End to End.

Dhaulagiri Kalika Hydro was established with one aim: developing hydropower in Nepal. Every component below, from the weir to the switchyard, belongs to one project.

01 /[ SYS.LOC // TYPE: DMHEP ]

Project Area

Malika Rural Municipality, Myagdi District, Gandaki Province. The headworks stand 3 km upstream of Darbang Bazaar on the left bank of the Myagdi Khola; the powerhouse lies 2.5 km downstream on the right bank.

02 /[ SYS.LOC // TYPE: DAM ]

Dam

A 37 m long concrete gravity weir across the Myagdi Khola, with two under-sluices (3 m wide) fitted with hydraulic gates to flush sediment past the intake.

03 /[ SYS.LOC // TYPE: INTAKE ]

Intakes

Four side intakes, each 3.8 m wide, draw water from the weir into the waterway system.

04 /[ SYS.LOC // TYPE: SETTLING ]

Settling Basin

Two double-chambered settling basins, 115 m long, settle out sediment before the water enters the headrace tunnel.

05 /[ SYS.LOC // TYPE: HRT ]

Headrace Tunnel

A 3,030 m headrace tunnel, 4.6 m in diameter and inverted D shaped, carrying the design discharge of 31.4 m³/s toward the shafts.

06 /[ SYS.LOC // TYPE: SHAFTS ]

Surge & Drop Shafts

A vertical surge shaft 38 m high (10 m diameter) to absorb pressure transients, and a vertical drop shaft 55 m deep (4.6 m diameter).

07 /[ SYS.LOC // TYPE: PENSTOCK ]

Penstock Pipe

A 1,250 m penstock pipe, 4.0 m in diameter, delivering water from the shafts to the turbines under a gross head of 104 m.

08 /[ SYS.LOC // TYPE: POWERHOUSE ]

Powerhouse

A 30 m by 50 m powerhouse on the right bank of the Myagdi Khola, 2.5 km downstream of Darbang Bazaar, housing all generating equipment for the project's 25 MW.

09 /[ SYS.LOC // TYPE: GRID-132KV ]

Transmission Line

A 132 kV transmission line roughly 7.5 km long evacuates the generated power to the national grid at the Nepal Electricity Authority's Dandakhet substation.

[ GEOMORPHIC MESH // SCALE 1:25000 ] LIVE SCAN MAPPED
REF: MYAGDI.KHOLA_GRID_2026// STRUCTURAL MODEL MATRIX ACTIVE
AZIMUTH: 0°ELEV: 0M
// SEC. 02: THE PROJECT, ZONE BY ZONE

Inside the Project.

The Darbang Myagdi Hydro-Electric Project is engineered as an integrated 25 MW run-of-river scheme. Every zone below, from the intake weir to the 132 kV grid connection, forms the complete hydraulic and power generation chain.

ZONE-HWDARBANG, MYAGDI
37 m Concrete Weir // Gated Intake // Desanding Basin
Weir Length37.0 m
Design Silt Exclusion> 90%

Located on the left bank of the Myagdi Khola ~3 km upstream of Darbang Bazaar. A 37 m concrete gravity weir with gated under-sluices, side intake, and twin desanding basins removes sediment before water enters the conveyance waterway.

// SEC. 03: PROJECT METRICS

One River.

One Project.

25 MW under construction on the Myagdi Khola: 150 GWh of firm annual energy, sold to the national grid under a long-term NEA power purchase agreement.

// FIG_01[+] SCAN
0MW
// Installed Capacity
// FIG_02[+] SCAN
0GWh
// Annual Energy
// FIG_03[+] SCAN
0m
// Headrace Tunnel
// FIG_04[+] SCAN
0km²
// Catchment Area
// SEC. 04: THE INSTITUTIONAL STANDARD

Licensed. Contracted. Building.

Dhaulagiri Kalika Hydro is building the Darbang Myagdi Hydro-Electric Project under Nepal's hydropower framework: DoED-licensed, PPA-contracted with the NEA, and backed by a development agreement signed with Sanima Hydro in 2019.

// MATRIX_TRACK.01DOED_LICENSE

DoED Licensed

The Darbang Myagdi Hydro-Electric Project is licensed by the Department of Electricity Development, Nepal's national authority for hydropower development.

(+)DoED LICENSED
(+)TYPE: RUN-OF-RIVER
(+)CAPACITY: 25 MW
// MATRIX_TRACK.02NEA_PPA

NEA Power Purchase

The project sells its energy to the Nepal Electricity Authority, evacuated at 132 kV over 7.5 km to the Dandakhet substation, tying Darbang into the national grid.

(+)NEA PPA
(+)132 KV EVACUATION
(+)GRID: NATIONAL
// MATRIX_TRACK.03SANIMA_2019

Sanima Hydro Agreement

A development agreement between Sanima Hydro and Dhaulagiri Kalika Hydro Ltd, signed in December 2019, anchored the project's path to construction.

(+)SIGNED: 2019
(+)PARTNER: SANIMA HYDRO
(+)STATUS: ACTIVE
View Verified Credentials[ CLASSIFICATION: OFFICIAL DATA SHEET REGISTER ]
// SEC. 05: INTAKE PROTOCOL

Contact Darbang Hydro.

Partnership proposals, community matters, procurement questions, or shareholder queries: our corporate desk routes every message to the right team.

// 04 / SELECT INQUIRY TYPE
✕
[DEV] Project
✕
[CON] Construction
✕
[ENV] Environment
✕
[IR] Investor
ProjectDarbang Myagdi Hydro-Electric Project
Drawing No.DKHL-DMHEP-001
Status[ Under Construction ]