ARCHCIV_2026
// SEC. 01: INSTITUTIONAL PROFILE

Built on Myagdi River.
Driven by Purpose.

+
[ LAT: 28.36° N // MYAGDI // UNDER CONSTRUCTION ]

Founded by investors from Myagdi District and now building the Darbang Myagdi Hydro-Electric Project: 25 MW of run-of-river power on the Myagdi Khola, in Malika Rural Municipality.

Darbang and the Myagdi Khola, Myagdi District, Nepal
[+] REG_CHR|SEC.02
AUTH_ID // 2026
Binod Kunwor - Chairman, Dhaulagiri Kalika Hydro

Mr. Binod Kunwor

CHAIRMAN[ VERIFIED_LEAD ]
// A MESSAGE FROM THE CHAIRMAN
“

On behalf of the Board of Directors, I welcome your interest in Dhaulagiri Kalika Hydro Limited.

We hold one mandate: complete the Darbang Myagdi Hydro-Electric Project with discipline and full transparency.

+
+
// MANIFESTO_LOG.01 // OUR MANDATE

Dhaulagiri Kalika Hydro Limited was established by investors from Myagdi District, many of them based abroad, to develop hydropower in Nepal. The Darbang Myagdi Hydro-Electric Project is the company's sole undertaking, and it receives the Board's complete attention.

// MANIFESTO_LOG.02 // GOVERNANCE & ACCOUNTABILITY

The Board safeguards shareholders' investment through disciplined project management, statutory compliance, and transparent reporting. Every material decision follows the governance procedures the company owes its owners and partner institutions.

// MANIFESTO_LOG.03 // BUILDING FOR THE LONG TERM

A hydropower plant serves for generations, and the Board plans on that horizon. We remain accountable to our shareholders, to our partner institutions, and to the communities of Malika Rural Municipality who host the project.

// DIGITAL SIGNATURE CAPTURED //B. Kunwor
LOG_2026
// SEC. 02.B: COMPANY CHRONOLOGY

How We Got
Here.

From NRN investment to civil works at Darbang: the record of one project, built by one company.

// TRACK_01
(+)2019
// NRN_INVESTMENT // A Company of Myagdi Investors

Dhaulagiri Kalika Hydro Limited is established by investors from Myagdi District, many of them non-resident Nepalis, with the aim of developing hydropower projects in Nepal.

// TRACK_02
(+)2019
// SANIMA_AGREEMENT // Sanima Hydro Agreement

Sanima Hydro and Dhaulagiri Kalika Hydro Ltd sign a development agreement on 2 December 2019, anchoring the project's path to construction.

// TRACK_03
(+)2019
// CONSTRUCTION_BEGINS // Construction Begins

Construction of the Darbang-Myagdikhola Hydropower Project starts in Malika Rural Municipality: the 25 MW scheme on the Myagdi Khola, built with investment from non-resident Nepalis.

// TRACK_04
(+)2025
// PROJECT_EXECUTION // Project in Execution

Works continue across the weir, the waterways, and the powerhouse. Procurement remains active, with sealed quotations invited for site packages as recently as September 2025.

// SEC. 02.C: RESOURCE COMPOSITION & GOVERNANCE

The People Behind the Megawatts.

A board of eight directors and executive leadership from Myagdi District and across the globe, overseeing the development and delivery of the 25 MW Darbang Myagdi Hydro-Electric Project with statutory discipline.

+
+
[+] REG_DIR|CHAIRMAN
01 // 2026
Mr. Binod Kunwor
CHAIRMAN

Mr. Binod Kunwor

Mr. Kunwor is an NRNA residing in South Korea and former country president of the NRNA Korea Chapter. He is a successful businessman with a diversified business portfolio across Agriculture, Tourism, Hotel & Restaurants, Travel, Finance, and Trading.

DKHL_BOARD // REG[ VERIFIED_LEAD ]
+
+
[+] REG_DIR|MANAGING DIRECTOR
02 // 2026
+
+
+
+
HM
[ SPEC_REGISTERED ]
MANAGING DIRECTOR

Mr. Harkaman Magar

Holds a degree in Electrical Engineering and was an NRNA residing in Hong Kong. Prior to relocating to Nepal to lead this project, he owned and managed Construction and Trading enterprises in Hong Kong.

[ VERIFIED_LEAD ]
+
+
[+] REG_DIR|DIRECTOR
03 // 2026
Mr. Tejendra Roka Magar
DIRECTOR

Mr. Tejendra Roka Magar

Holds a Master's degree in Civil Engineering and is a PhD scholar at Kathmandu University. Resident in the UK, he was founder president of NEA UK Chapter and Treasurer of NRNA UK (2017–2019), bringing extensive international civil engineering expertise.

DKHL_BOARD // REG[ VERIFIED_LEAD ]
+
+
[+] REG_DIR|DIRECTOR
04 // 2026
+
+
+
+
GT
[ SPEC_REGISTERED ]
DIRECTOR

Mr. Gyanendra Thapa

An NRNA residing in Hong Kong who owns and operates a well-established and successful construction business in Hong Kong, supporting major overseas infrastructure investments.

DKHL_BOARD // REG[ VERIFIED_LEAD ]
+
+
[+] REG_DIR|DIRECTOR
05 // 2026
Mr. Dal Bahadur Bhattachan
DIRECTOR

Mr. Dal Bahadur Bhattachan

A retiree from the Indian Army who has channeled decades of disciplined service and management into successful enterprises across Agriculture and Real Estate in Nepal.

DKHL_BOARD // REG[ VERIFIED_LEAD ]
+
+
[+] REG_DIR|DIRECTOR
06 // 2026
Mr. Amrit Gauchan
DIRECTOR

Mr. Amrit Gauchan

Holds a Bachelor's degree in Business Administration (BBA) and is actively involved in hospitality, managing prominent hotel and restaurant ventures with strong local ties.

DKHL_BOARD // REG[ VERIFIED_LEAD ]
+
+
[+] REG_DIR|DIRECTOR
07 // 2026
+
+
+
+
PB
[ SPEC_REGISTERED ]
DIRECTOR

Mr. Purna Bahadur Kunwor

An accomplished investor and entrepreneur deeply engaged in Trading, Finance, Agriculture, and Real Estate development, driving commercial growth in the region.

DKHL_BOARD // REG[ VERIFIED_LEAD ]
+
+
[+] REG_DIR|DIRECTOR
08 // 2026
Mr. Chitra Bahadur Pun
DIRECTOR

Mr. Chitra Bahadur Pun

Holds a Master's degree in Business Administration (MBA). Currently serves as Finance Director of Tilicho Group, which holds diversified interests in Finance, Healthcare, Agriculture, Tourism, and Hospitality.

DKHL_BOARD // REG[ VERIFIED_LEAD ]
[+]GOVERNANCE_LEDGER // 2026 ACTIVE SPECIFICATION
TOTAL BOARD & EXECUTIVE RECORD: 08 PROFILES REGISTERED
// SEC. 02.D: MISSION & VISION

Mission & Vision.

// OPERATIONAL_DIRECTIVE_01

Our Mission

Encourage investment in clean and sustainable energy projects while maintaining shareholders' return and fulfilling socio-economic obligations.

[ MISSION ]
// OPERATIONAL_DIRECTIVE_02

Our Vision

Participate in the nation's development by developing clean and sustainable energy.

[ VISION ]
// OPERATIONAL_DIRECTIVE_03

Our Commitment

Transparent, disciplined governance, with benefit-sharing for the communities of Malika Rural Municipality along the Myagdi Khola.

[ COMMITMENT ]
// SEC. 03.A: THE INSTITUTIONAL STANDARD

Licensed.
Verified.
Trusted.

Dhaulagiri Kalika Hydro is building the Darbang Myagdi Hydro-Electric Project under Nepal's hydropower framework: DoED-licensed, PPA-contracted with the NEA, with energy evacuated at 132 kV to the Dandakhet substation.

// MATRIX_TRACK_01[ DOED-NEPAL ]

DoED Licensed

The Darbang Myagdi Hydro-Electric Project is licensed by the Department of Electricity Development, Nepal's national authority for hydropower development.

// MATRIX_TRACK_02[ NEA-PPA-132KV ]

NEA Power Purchase & 132 kV Evacuation

The project sells its energy to the Nepal Electricity Authority, evacuated at 132 kV over 7.5 km to the Dandakhet substation, tying Darbang into the national grid.

// MATRIX_TRACK_03[ SANIMA-2019 ]

Sanima Hydro Agreement

A development agreement between Sanima Hydro and Dhaulagiri Kalika Hydro Ltd, signed in December 2019, anchored the project's path to construction.

DESIGN SPECDKHL DMHEP TEAM
MANIFEST NO.DMHEP-QA-2026
SCALE METRIC1:1 CONSOLE
SYS_STATUS[ SECURE_OK ]
// PROJECT_REFERENCE_FOOTNOTE

Licence and agreement references on this page summarize the project records held by Dhaulagiri Kalika Hydro Ltd.

[ REF: MYAGDI_DMHEP_MATRIX ]
ProjectDarbang Myagdi Hydro-Electric Project
Drawing No.DKHL-DMHEP-001
Status[ Under Construction ]
Darbang Hydro Logo
© 2026 DHAULAGIRI KALIKA HYDRO LIMITED // ALL RIGHTS RESERVED.
PRIVACYTERMS[ SYSTEM DESIGN: ADVAITA ]